82 MW solar park in Chiriquí

82 MW solar park in Chiriquí

Type: Infrastructure / Solar energy Location: Chiriquí, Panama Hectares: 64 ha Code: PT-SA018
License PJ-1345

Photovoltaic park in Chiriquí

A project to develop, build, and operate a solar park of up to 82 MWp on 64 ha in Chiriquí Province. The plant would convert solar radiation into electricity and deliver that energy to the national grid.

The stated scope includes photovoltaic modules, inverters, transformation equipment, civil and electrical works, and the monitoring, control, protection, and communication systems required for operation.

The reference document notes global horizontal irradiation of 1,990 kWh/m² per year, equal to 5.5 kWh/m² per day. The stated specific yield is 1,740 kWh/kWp per year, with annual output of 143 GWh and daily output of 390 MWh. The stated service life is 35 years.

The interconnection point is a substation 10.5 km from the land. The stated schedule, from studies and permitting through testing and commissioning, is 18 months.

The progress described includes the project company and notice of operation, preliminary engineering, solar-resource assessment, conceptual design, a defined interconnection point, land-use agreements, and preparation of the ASEP filing. Letters of intent for design and for operation and maintenance, a provisional license, and an interconnection agreement are also mentioned. The definitive license, for 40 years, remains to be obtained.

The energy could be sold under a supply contract, on the occasional market, or through a mixed scheme. This presentation does not include a signed power-purchase agreement. The owner, developer, and construction contractor are not published here. Licenses, land, interconnection, and delivery scope should be confirmed independently.

Development Potential

Up to 82 MWp · Photovoltaic generation in Chiriquí · Connection to the national grid

Alternatives to be assessed case by case, subject to technical, environmental, and legal studies and to applicable regulations.

Key Features

Up to 82 MWp

Stated installed capacity of the photovoltaic park.

64 hectares

Land area associated with the project.

143 GWh per year

Stated annual output, subject to technical verification.

Interconnection 10.5 km away

Substation identified as the project connection point.

Property Gallery

82 MW solar park in Chiriquí — image 1
82 MW solar park in Chiriquí — image 2
82 MW solar park in Chiriquí — image 3
82 MW solar park in Chiriquí — image 4
82 MW solar park in Chiriquí — image 5
82 MW solar park in Chiriquí — image 6
82 MW solar park in Chiriquí — image 7
82 MW solar park in Chiriquí — image 8

The information on this listing does not constitute an offer, a promise of returns, or legal, financial, or tax advice. Specialized services, when applicable, are provided by external professionals.